Governance Compliance Pipeline
Gate: P3 (advisory on PR) + weekly staleness cron + manual repair dispatch
Trigger: PR touching governance files, Monday 06:00 UTC cron, manual dispatch
Workflow: validator-governance-check-governance-map.yml
What happens when governance files change
What happens every Monday at 06:00 UTC
What happens on manual repair dispatch
Validators
Generators
Gaps
- Advisory only on PR: Governance checks do not block merge (P3). Human review is the final gate
- Weekly cron only: No continuous monitoring between Monday checks. A framework could go stale mid-week without detection until the next cycle
Last modified on May 22, 2026